Internal panel filters are inserted to provide for optimum dewatering.
Viewed: 349 times.
|
This pair of sludge boxes can process up to 80,000 GPD of processed liquid sludge.
Viewed: 306 times.
|
Sludge will later be removed with a roll-off truck through the rear entry of the boxes.
Viewed: 288 times.
|
After the doors are closed, the box is ready to be filled.
Viewed: 303 times.
|
Stainless steel will provide for a longer life. These boxes are lighter in weight.
Viewed: 263 times.
|
Boxes can be purchased with and without a roof.
Viewed: 290 times.
|
Our roof design permits the entire box to be open.
Viewed: 278 times.
|
This design makes it much easier to clean the inside filters because you will not have a confined space to enter
Viewed: 296 times.
|
The sludge inlet is on the end of the box and..
Viewed: 273 times.
|
...the clean liquid discharge is on the sides or ends.
Viewed: 285 times.
|
Sludge optimization packages can be added to your box.
Viewed: 262 times.
|
Once the box has dewatered the sludge, it is ready to be diposed of.
Viewed: 290 times.
|
The following series of photos show this...
Viewed: 262 times.
|
|
|
|
|
|
|
|
|