Welcome to Pat Jackson's Septic Processing Facility.
Viewed: 301 times.
|
Septic Tankers unload their liquid waste at the headworks of the facility
Viewed: 288 times.
|
A basic screening device separates the large waste products from the liquid waste
Viewed: 267 times.
|
Liquid material is pumped to the Green Mountain DeTainers.
Viewed: 294 times.
|
With the use of polymers we reduce the total volume to 2-5% of the influent to the plant.
Viewed: 312 times.
|
Depending on the quality of the liquid waste, operators generate a 15-25% total solid product.
Viewed: 282 times.
|
This material is completely settled and utilized at the composting plant.
Viewed: 273 times.
|
Once completely dewatered, the Detainers are transported to the composting portion of the plant.
Viewed: 252 times.
|
Roll-Off or Hook lift options are available on most sizes of the Green Mountain Equipment.
Viewed: 264 times.
|
The material is unloaded on a cement platform preparing the volumes to compost.
Viewed: 239 times.
|
Consisitancy and quality of the material dictates the amount of carbon that will be added to make compost.
Viewed: 267 times.
|
|
|
|
|
|
|
|
|
|
|
This material is indicative of the sludges that will be processed efficiently in the Containerized Composting System.
Viewed: 272 times.
|