Facility Receives Grease Trap Waste and is immediately screened in a Lely Maximizer
Viewed: 122 times.
|
Receiving Pipe, Screening, Sludge Pump and Polymer System are all in this very small working area.
Viewed: 115 times.
|
Mixing and/or circulation of the liquid waste is crucial for the optimum success of the system.
Viewed: 110 times.
|
A Polymaster is protected for the Georgia Winters and Summers
Viewed: 120 times.
|
Netzsche's Sludge Pump with Custom VFD improves the operation of this sytem.
Viewed: 125 times.
|
Once the Sludge and Polymer is mixed in the lines, it is introduced to the sludge box via this port. A bypass is installed to prevent bad processing runs.
Viewed: 115 times.
|
Once the Container is filled, an overnight settling phase allows all free water to exit the container.
Viewed: 131 times.
|
|
The following morning, the container is moved to the dumping site.
Viewed: 124 times.
|
A Roll-off Truck Dumps the solid waste into the storage area.
Viewed: 123 times.
|
|
|
|
|
|
|
|
With an optimum process, the container dumps free of most of the solids.
Viewed: 125 times.
|
|
|
Another successful "Run"!
Viewed: 141 times.
|